Staircase...
Upstairs Ensuite basins...
Laundry....
Downstairs Ensuite basin...
Downstairs walk-in shower...the niche still needs to be tiled...
We have an appointment with the kitchen designer and installer next Tuesday, this is to measure up for the cabinetry. The kitchen can't be installed though until the keys have been handed over to us!!!
Once the tiles have been done, then the painter starts....followed by the installation of the carpet. The outside of the house still needs to be painted and finished off, and the driveway is still to be installed too.
We are now working on getting quotes for the landscaping....and finishing off the swimming pool.
Still a bit to get done but mainly cosmetic finishes. Until the next update.
No comments:
Post a Comment