Sunday, August 23, 2009
Nearly at lock up stage!!
We are very nearly approaching lock up stage!....at present the external brick work is being bag and painted. The electricians are inside wiring the house and the air-conditioning guys have put in the ducting throughout the roof space, oh and the drainage contractor is at present putting in the external drainage pipes.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment