Inside the roof space of the balcony off the study....We shouted the two roofers a couple of slabs of beer.!
The next phases are:
1. Lower the scaffolding
2. Carpentry under the eaves
3. Place the cladding on the upper level
4. Paint the upper area
5. Lower the scaffolding again
6. Roofers return to do the lower level
7. Finish the eaves on the lower level
8. Complete the downstairs painting
Until the next update...